97精品国产,午夜久久成人电影,午夜岛国视频,国产 欧美白虎一区二区三区

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: m.555198.cn

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
五月丁香六月婷婷激情综合网| 久久精品在一起性生活| 女同日韩中文字幕在线| 国产精品露脸AV在线| 久久久成人在线| 四虎做爱视频| 插骚女b叫插| 亚洲欧美日本制服人妻麻豆99| 狠狠亚洲精品| 久久人妻少妇嫩草av密桃| 青青草原亚州一区| 大屁股一区二区| 射天天干天天插| 嫩草蜜桃亚洲| WWW久久久天堂亚洲韵味| 五月婷婷的| 91精品视频在| 日本免费一区二区三区在线观看| av一区三区有码| 亚州人妻夜夜摔| 噜噜色男人的天堂密臀av| 欧美日韩国产亚洲日本精品性爱| 久久久久性| 成人网站免费观| 亚洲成人黄色豆花视频免费观看| 亚洲欧美日韩国产一区吃瓜| 色婷婷久久久精品| 一级片中文字幕老人与人妻| 少妇躁爽到高潮无码久| 干B久久久久久久久久久久| 不卡AV福利| yiren22亚洲国产综合精品| 三级小说国| 一区二区三区 人妻| 欧美精品 国内精品| 奇米影视国产一区二区在线| 久久久婷婷一区二区| 99国产精品久久久久久99| 蜜桃嫩操网| 国语特级毛片| 欧美激情射精在线播放|