97精品国产,午夜久久成人电影,午夜岛国视频,国产 欧美白虎一区二区三区

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: m.555198.cn

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
久久在线国产精品尤物v| 天堂在线A在线看| 国产欧美一区二区三区精品起碰| 日本高清色晰视频| 亚洲日本无码一区二区| 亚洲国产香蕉在线| 国产剧场一区二区三区| 偷拍自拍 欧美| 99久久久精品| 久久久天堂无码中文字幕| 国产日韩欧美肏穴网站在线观看| 亚洲AV综合AV一区二区三区粉嫩| 日韩超清无码资源| 日韩人妻精品中文字幕| 亚洲级淫片| 欧美久久久日本无码| 日韩免费成人不卡AV| 婷婷久七久久高潮片| 日韩欧美一区2区三区四区五区| 啊啊啊逼逼视频| 影音先锋 二区| 中文字幕人妻第三页| 亚洲hs视频| 日本久久精品视频一区| caoporn超碰蜜臀| 成人福利视频免费观看播放| 久久精品视频第一| 国产欧美下一页一区在线| 日韩三线片| 日韩入B无码| 国产一级亚洲AV| 欧美图片区国产| 色欲色婷婷五月天| 国产麻豆兄妹| 久久欧美黑人在线| 欧美日倝精品在线| 欧美美国一区| 精品国产91久久久无码| 午夜麻豆婷婷| 干B视频高清| 插b视频在线观看网址|